1 x
5/16 x 2-3/8” Hex Bolt (5/16” flat washer, 5/16” t-nut)
3 x
5/16 x 2-1/8” Hex Bolt (5/16” flat washer, 5/16” t-nut)
1 x
5/16” T-Nut
Hardware
Wood Parts
Fig. 39.3
393
1 x
A Frame Upright FSC 2 x 4 x 41-1/2”
1 x
A Frame Lower Side FSC 5/4 x 4 x 60”
Step 39: A Frame MK Wall Assembly
Part 2
C:
Install one 5/16” T-Nut into 1 (390) A Frame Upright. (fig. 39.2)
D:
Loosely attach (390) A Frame Upright to (391) A Frame Floor Support with 1 (WB8) 5/16 x 2-3/8” Wafer Bolt
(with flat washer and t-nut) and to (392) A Frame Top Side with 1 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat washer
and t-nut), as shown in fig. 39.3. Notice the direction the 5/16” T-Nut installed in Step C is facing.
E:
Loosely attach (393) A Frame Lower Side to (382) A Frame Post and (380) A Frame Access R with 2 (WB9)
5/16 x 2-1/8” Wafer Bolts (with flat washer and t-nut) in the bottom holes. (fig. 39.3)
Notice t-nut
location
380
5/16” Flat
Washer
5/16”
T-Nut
382
391
Notice board
location
392
5/16” Flat
Washer
5/16”
T-Nut
390
Fig. 39.2
5/16”
T-Nut
390
390
393
WB9
WB9
WB8
WB8
WB9
Notice the distance
between the bottom
of (391) A Frame Floor
Support and the bolt
hole in (390) A Frame
Upright must be 11-3/8”
11-3/8
”
110
support@cedarsummitplay.com