Hardware
Wood Parts
Step 14: Attach Floor Joist
A:
With one person inside the assembly line (140) Floor Joist up to the pilot holes on the (092) Floor End then
attach with 2 (S4) #8 x 3” Wood Screws. The joist should rest on (061) Door Wall Window Panel. (fig. 14.1 and
14.2)
B:
Line (140) Floor Joist up to the pilot holes on the (043) SW Side Panel, making sure the top of the joist is
flush to the top of the panel board shown in fig. 14.3 then attach with 2 (S4) #8 x 3” Wood Screws. (fig. 14.1,
14.3 and 14.4)
Fig. 14.3
1 x
Floor Joist FSC 2 x 4 x 81”
4 x
#8 x 3” Wood Screw
S4
140
Fig. 14.2
Inside View
061
Flush
140
Fig. 14.1
Fig. 14.4
092
140
043
043
Flush
Note: Board removed for clarity.
S4
S4
68
support@cedarsummitplay.com