A:
With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 34.1, then
pre-drill 1/8” pilot holes in the bottom 4 mounting locations on (331) Crowsnest Gap Board (approximate spots
where circles are on figure), making sure the pre-drilled holes are a minimum of 1” deep.
B:
Attach Flange Assembly to the Crowsnest through (331) Crowsnest Gap Board and into (321) Crowsnest
Front using 4 (S7) #12 x 2” Pan Screws (with #12 Screw Bezel) in the pre-drilled holes. (fig. 34.1 and 34.2)
Make sure the flat surfaces of the Flange Assembly are flush to the Crowsnest as shown in fig. 34.5.
C:
Attach the Flange Assembly flush to (324) Crowsnest Top using 4 (S6) #12 x 1” Pan Screws (with #12
Screw Bezel) as shown in fig. 34.1 and 34.3 and to both (334) Crowsnest Faces using 5 (S6) #12 x 1” Pan
Screw per board. (fig. 34.1 and 34.4)
Step 34: Attach Flange Assembly to Fort
Hardware
14 x
#12 x 1” Pan Screw
4 x
#12 x 2” Pan Screw
8 x
#12 Screw Bezel
S7
Flange
Assembly
#12 Screw
Bezel
#12 Screw
Bezel
Bottom
Sides
Top
324
334
321
331
324
Bottom of
slide flush
with deck
Top of slide
flush to 324
Crowsnest Top
Fig. 34.1
Fig. 34.6
Fig. 34.4
Fig. 34.3
Fig. 34.2
Fig. 34.5
(hidden)
Outside View
Inside View
S6
(hidden)
334
334
S6
S6
S7
110
support@cedarsummitplay.com