User’s manual
23
EN
4. MoUnTInG
- Remove the tower (hori vertical arms) from their position on the pallet.
- Mount the pole using screws P (Fig.5a), use tightening torque 70 Nm.
- Assemble the bead breaker with the proper pin and fasten it with the locknut until there
is a slight resistance in the rotation of the bead breaker (Fig. 5b).
- Install the infl ation pressure gauge box on the pole (A, Fig. 5c).
T.I Version
- Connect the tank union to the air connection pipeline provided, securing it with a band
clamp.
5c
A
5b
5a
P
P
Summary of Contents for SM628TI
Page 15: ...User s manual 15 EN 01 05 02 06 07 08 18 09 14 21 21 04 12 11A 11B 10 17 16 15 19 03 20...
Page 60: ...Note...
Page 61: ...Note...
Page 75: ...Manuel d utilisation 75 FR 01 05 02 06 07 08 18 09 14 21 21 04 12 11A 11B 10 17 16 15 19 03 20...
Page 120: ...Note...
Page 121: ...Note...
Page 135: ...Manual de uso 135 ES 01 05 02 06 07 08 18 09 14 21 21 04 12 11A 11B 10 17 16 15 19 03 20...
Page 180: ...Note...
Page 181: ...Note...
Page 182: ...Note...
Page 183: ......