18
GB
5.4 Transport
During transport, observe the pertinent
regulations for transport and securing loads,
in particular:
• Road traffic (licensing) act of the country
in question
• CEN 12195 Parts 1 to 4 for calculation
and lashing.
For a closed transport vehicle, adequate ventila-
tion must be provided for driver/passenger and
filling station.
i
Important!
Positive fit before traction!
First, try to positively load the equipment
(e.g. through striking the sides).
Excessive lashing forces can deform the
tank and thus damage it.
5.5 Filling the tank
The screw cap
a
is automatically ventilated
and vented.
Differential pressure may cause tanks to deform
slightly and there may be a noise as the pressure
balances out when opening the screw cap
a
.
Before opening the filling lock
a
, make a
conductive connection with the earth cable
h
between the tank and the transport vehicle or
the ground.
Open screw cap
a
.
Fill the container through the filling opening
using a delivery nozzle with automatic shut-off
feature.
After filling, close the filling open again
with the cap
a
.
Disconnect earth cable
h
from the transport
vehicle or from the ground, wind it up and fix the
terminal clamp to the point provided.
Contamination of the container caused by the
filling process must be removed immediately
with a dry cloth.
5.6 Filling
Filling is possible when the tank is in a horizon-
tal or vertical position. Better suction and total
evacuation is achieved when the tank is in a
horizontal position.
Note that excessive tensile forces on
the delivery hose may tip the fuel
trolley out of the vertical position.
Make a conductive connection with the earth
cable
h
between the tank and the transport
vehicle or the ground.
Open the delivery line ball valve
b
.
Open the delivery nozzle lock and insert the
delivery nozzle fully into the container/tank to
be filled.
Operate delivery nozzle
e
.
Move the hand pump forwards and backwards
in a horizontal direction and start the filling
procedure.
i
Important!
Constantly monitor the filling process.
Ensure sufficient ventilation in the area of the
tank during the fuelling process.
Only operate the hand pump when the
ball valve is open!
After the filling process:
Close delivery nozzle and allow to stop dripping.
Wind up hose.
Insert the delivery nozzle into the integrated
delivery nozzle holder
i
and secure with the
delivery nozzle lock
g
.
Close ball valve of the delivery line
b
.
Disconnect earth cable
h
from the transport
vehicle or from the ground, wind it up and
fix the terminal clamp to the point provided.
Summary of Contents for Trolley 60 l AdBlue Car PRO
Page 12: ...12 GB 0423 Technische Daten 103080035 K10C Cemo Liegend doc 3 3 D ...
Page 13: ...13 GB D ...
Page 23: ...23 GB 0423 Technische Daten 103080035 K10C Cemo Liegend doc 3 3 ...
Page 24: ...24 GB ...
Page 34: ...34 F ...
Page 53: ...53 Notizen E ...
Page 54: ...54 Notizen ...
Page 55: ...55 Notizen ...