- 2 -
Instructions p/n 9000146
5/14/2013
3. Remove all ashes from the firebox and
Reaction Chamber.
Fig. 1
4. Remove the grate bars, refractory panels,
and the refractory target from the outdoor
furnace as shown in Fig. 1 and discard.
NOTE: Fig. 1 is for illustration purposes
only. The quantity of the refractory panels
may vary from model to model.
5. Install the replacement Refractory Target
as shown in Fig. 2. Make sure the beveled
side is facing towards the inside of the
firebox.
6. Connect the electrical power to the outdoor
furnace at the main power source; then turn
on the gas supply at the appliance service
valve.
Fig. 2