background image

- 2 -

Instructions p/n 9000146

  5/14/2013

3.  Remove  all  ashes  from  the  firebox  and 

Reaction Chamber.

Fig. 1

4.  Remove the grate bars, refractory panels, 

and the refractory target from the outdoor 

furnace as shown in Fig. 1 and discard.

NOTE: Fig. 1 is for illustration purposes 

only. The quantity of the refractory panels 

may vary from model to model.

5.  Install the replacement Refractory Target 

as shown in Fig. 2. Make sure the beveled 

side is facing towards the inside of the 

firebox.

6.  Connect the electrical power to the outdoor 

furnace at the main power source; then turn 

on the gas supply at the appliance service 

valve.

Fig. 2

Reviews: