Fig 3- Cable Routing Fig 4- Attaching
Cable
Prior to operation of lift recheck equalizer cables making sure they are not
crossed or routed improperly. Be sure the cables have remained in place
over the pulleys.
P
OWER UNIT &
H
YDRAULIC HOSE
18. Mount Power Unit to power column with M8 hex nuts, M8
×
20 bolt.
19. Attach hydraulic elbow fitting to power unit.
20.
IMPORTANT
–
To insure proper hose fitting seal without damage to the fitting follow this
procedure for each hose connection:
Screw flared fitting on finger tight. Rotate flared fitting 1 1/2 hex
flats (90 deg.). Back the flared fitting off one full turn. Again tighten flared fitting finger tight, then
rotate flared fitting 1 1/2 hex flats (90 deg).
21. Thread power unit hydraulic hose into elbow on power unit. Route hydraulic hose from Idler column
across Overhead to the Power Column.(Fig 6)
22. Once the Power Unit is secured, fill reservoir with #10 weight
HYDRAULIC OIL ONLY
. Care
should be taken to keep dirt or other contamination out of oil.