SKU 92409 For technical questions, please call: 1-800-444-335 Page 5
Installing the Plastic Tub
1.
There are two rails that act as tracks for the
Plastic Tub (9). These rails are installed under
the drainage holes at one end of the
Transmission Table Top (6).
See Figures 6 & 8.
2.
Slide the Plastic Tub (9) into the track on the
underside of the Table Top (6). Be sure it is
positioned under the drain holes before
working on machinery to insure catching any
liquids.
See Figures 6 & 8.
3.
After sliding the Plastic Tub (9) into place,
screw in the two Bolts (12) into the holes on
the track. This will prevent the Plastic Tub from
sliding too far forward. Remove the Bolts to
empty fluids caught in the Tub.
Follow the
disposal of Hazardous Waste instruction on
Page 3. See Figure 7.
Plastic
Tub (9)
Figure 6
Figure 7
Bolt 12
Track
Plastic
Tub (9)
Figure 4
Figure 5
Key and
Lock (13)
Plastic
Drawer
Stop
7.
Use the Keys and Lock (13) to secure objects
when not in use.
Figure 5.
6.
Once the Drawer (8) is in place on the track,
install the Locks (13) at the back of the Drawer.
Push the Button on each side into the predrilled
holes to secure Drawer (8). This will prevent the
Drawer from being pulled out too far and
spilling the contents on the floor. To remove the
Drawer, reverse the step.
See Figure 4.
Figure 8
Drainage
Holes