E1200 HT 260-3
8BMaintenance
23.04.07
9-68
00401010_41087
9.10.3
Replacing Assembly Groups in the Gas System
1. Purge the process gas line according to process type.
2. Close the valves.
3. Close the upstream shut-off devices in gas direction.
WARNING!
Inert gas must be contained in the process gas line behind each assembly group to be
exchanged and the succeeding shut-off valve if the process gas line contains a toxic
and/or reactive process gas.
4. Dismount the assembly group and replace it.
5. Mount the assembly group and connect it.
6. Carry out leakage test, see chapter 9.11.2 Leakage Test for Vacuum Systems,
page 9-69.
7. Purge the process gas line according to process type.
8. Lower inert gas pressure.
9. Open process gas valve.
10. Start up the assembly groups of the process gas line and the assembly groups
which are connected to the process gas line in accordance with their intended use
and fill the process gas line with process gas.
11. The process gas line and the assembly groups are ready for process.
Summary of Contents for E1200 HT 260-3
Page 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Page 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Page 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Page 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Page 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Page 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Page 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Page 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Page 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Page 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Page 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Page 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...