E1200 HT 260-3
2BSafety
23.04.07
3-10
00401010_41087
3.7.4
Pneumatic System
Proceed as follows prior to servicing the pneumatic system:
—
Vent the pneumatic system and secure against accidental startup. Close the main
supply lines. Put up an information sign.
—
Depressurize the pneumatic system before servicing. Loosening the pressure lines
before they are depressurized can lead to injuries. Delivery hoses and other
system units can jerk violently.
Set the pneumatic system to the corresponding working pressure specified in the
layout listed in chapter 12.2 Drawings, Circuit Diagrams, Overviews, page 12-1.
Maintain the set working pressure. Too high working pressure leads to increased
material wear. Too low working pressure impairs the operatability.
Material fatigue impairs the safety and the operatability of the equipment. Replace hose
pipes according to specification in suppliers' documents, even if no safety relevant
defect is visible.
Observe the limiting values for pressure and temperature specified in the layout listed
in chapter 12.2 Drawings, Circuit Diagrams, Overviews, page 12-1.
3.7.5
Gas
The equipment is operated using the following process gasses:
—
phosphoryl trichloride (POCl
3
),
—
dichlorethylene (DCE),
—
silane (SiH
4
),
—
Oxygen (O
2
)
—
ethyl silicate (TEOS)
—
ammonia (NH
3
).
Summary of Contents for E1200 HT 260-3
Page 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Page 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Page 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Page 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Page 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Page 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Page 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Page 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Page 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Page 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Page 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Page 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...