E1200 HT 260-3
Table of Contents
23.04.07
00401010_41087
9.2.11.11
Actual Gas Flow Value Display without Setpoint........................................................... 9-30
9.3
Disturbance Diagnosis for Assembly Groups of the Equipment.............................................. 9-31
9.3.1
Laminar Flow Box Disturbances ......................................................................................... 9-31
9.3.1.1
Illumination Cannot Be Switched On ............................................................................. 9-31
9.3.1.2
Laminar Flow Box has Shut Down................................................................................. 9-31
9.3.2
Disturbances in the Loading Box ........................................................................................ 9-31
9.3.2.1
Inoperative Loading Machine (EFM).............................................................................. 9-31
9.3.2.2
Incorrect Loading Machine Operating Speed ................................................................ 9-31
9.3.2.3
Incorrect Loading Machine Positioning.......................................................................... 9-32
9.3.2.4
Inoperative Limit Switch at the Loading Machine .......................................................... 9-32
9.3.2.5
Loading Machine Operation in One Direction Only ....................................................... 9-32
9.3.2.6
Inoperative Lift Up Motor of the Soft Landing System (SLS)......................................... 9-32
9.3.3
Disturbances in the Toxic Gas Exhaust.............................................................................. 9-33
9.3.3.1
Tube Door Will Not Open............................................................................................... 9-33
9.3.3.2
Tube Door Will Not Close .............................................................................................. 9-33
9.3.3.3
Compressed Air Disturbances ....................................................................................... 9-33
9.3.4
Horizontal Furnace Disturbances........................................................................................ 9-34
9.3.4.1
Overheating of Heating Cassette Casing ...................................................................... 9-34
9.3.4.2
Inoperative Heating Cassette Zone ............................................................................... 9-34
9.3.4.3
Entire Heating Cassette Inoperative .............................................................................. 9-34
9.3.5
Disturbances in the Gas Cabinet including the Door.......................................................... 9-35
9.3.5.1
No Gas Flow in Gas Line............................................................................................... 9-35
9.3.5.2
Frozen Setpoint/Actual Value Display at the MFC Rack (Option) ................................. 9-36
9.3.5.3
Inoperative MFC ............................................................................................................ 9-36
9.3.5.4
Pneumatic Valves Do Not Switch (CAN Control) .......................................................... 9-36
9.3.5.5
Pneumatic Valves Do Not Switch (19" Rack) ................................................................ 9-36
9.3.5.6
Bubbler System Disturbance ......................................................................................... 9-37
9.3.5.7
Incorrect Gas Flow Velocity Ratios................................................................................ 9-37
9.3.5.8
Overheating of Control Cabinet Interior......................................................................... 9-37
9.3.6
Cell Controller Disturbances ............................................................................................... 9-38
9.4
Replacing the Assembly Groups at the Horizontal Furnace .................................................... 9-39
9.4.1
Replacing the Heating Cassette ......................................................................................... 9-40
9.4.2
Installing the Process Tube................................................................................................. 9-41
9.4.2.1
Installing the Quartz Process Tube................................................................................ 9-41
9.4.2.2
Installing the SiC Process Tube..................................................................................... 9-42
9.4.2.3
Installing the Vacuum Process Tube without Back Flange............................................ 9-44
9.4.2.4
Installing the Vacuum Process Tube with Back Flange................................................. 9-46
9.4.2.5
Installing the Vacuum Process Tube in PECVD Systems ............................................. 9-48
9.4.3
Mounting the Tube Closures............................................................................................... 9-50
9.4.3.1
Installing the Tube Closure – Standard Equipment ....................................................... 9-50
9.4.3.2
Installing the Tube Closure - Closed Tube System ....................................................... 9-51
9.4.3.3
Installing the Tube Closure - Vacuum System .............................................................. 9-52
9.5
Installing/Replacing a Thermocouple....................................................................................... 9-53
9.5.1
Installing a Profiling Thermocouple with Welded Tube Case ............................................. 9-53
9.5.2
Installing a Profiling Thermocouple with Inserted Tube Case ............................................ 9-53
9.5.3
Installing a Profiling Thermocouple in Vacuum Systems.................................................... 9-54
9.5.4
Installing the Spike Thermocouple...................................................................................... 9-54
9.6
Connecting Gas System and Process Tube ............................................................................ 9-54
9.6.1
Installing the Synthesis Steam Generator (Option) ............................................................ 9-54
9.6.2
Installing the Bubbler (Option) ............................................................................................ 9-55
9.7
Adjusting the Loading Machine Coupling................................................................................. 9-56
9.8
Aligning Light Barrier and Limit Switch .................................................................................... 9-57
9.8.1
Setting the Compressed Air (Option).................................................................................. 9-57
9.8.2
Adjusting the Swivel Motion of the Port Cover (Compressed Air, Option).......................... 9-57
9.8.3
Adjusting the Swivel Motion of the Port Cover.................................................................... 9-57
9.8.4
Port Travel Alignment (Compressed Air, Option) ............................................................... 9-57
9.8.5
Port Travel Alignment ......................................................................................................... 9-58
Summary of Contents for E1200 HT 260-3
Page 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Page 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Page 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Page 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Page 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Page 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Page 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Page 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Page 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Page 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Page 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Page 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...