page 19
3. If bolting onto an existing concrete
plinth, place the foundation plate down in
the correct position and use the plate as
a template for marking the rawl bolt
holes.
4. Assemble foundation plate without
anchor brackets before bolting down onto
plinth.
Ensure that the M10 gearbox
mounting bolts are properly
tightened.
Option 2: Existing concrete plinth
Route cables and secure foundation plate
1. Route cables as determined in Section 8, Cabling requirements.
FIGURE 14
370mm
30mm
M10
mounting
bolts
2. Make sure that all cables and conduits
protrude at least 400mm above the
baseplate once installed as shown in
Figure 14.
Make sure that the M10 bolts,
which secure the gearbox, are in
place.
3. Securely concrete or bolt the foundation
plate in position.
M10 nut
Use two M12
plated nuts as spacers
M10 washer
M10 x 95
expansion stud
M10 gearbox
mounting bolts
FIGURE 13