background image

3

Installation of LED Floodlight

3. Loose the two fixing screws, then adjust the angle of support 

bracket, and fix the screws at last.

1. Disconnect mains supply before installation or 

removing cover.

2. Drill two holes in the installation location, then fix the product in the 

location with screws. Distance between holes are in the chart.

A

B

C

COP-ECO-10-FB

Model:

A(mm)

B(mm) C(mm)

12.0

52

88

12.0

62

118

12.0

62

158

12.0

62

158

COP-ECO-20-FB

COP-ECO-30-FB

COP-ECO-50-FB

CEOTIS ECLAIRAGE

C/O SOITEC

Parc technologique des fontaines

Chemin des Franques

38190 Bernin France

Email:contact@ceotis.fr

TEL: +33 (0)476 92 97 70

5

5. Reconnect mains supply.

4

L(BROWN)

N(BLUE)

(GREEN/YELLOW)

INPUT 

CABLE

3X1.0

mm²

Outer insulation

Inner insulation

40±3mm

6±2mm

4.Individually connect the Live wire, Neutral wire and Ground wire of AC 

input wire to Brown, Blue and Green-Yellow wire. All cable terminals must 

be installed in accordance with the designed IP rating.

Reviews: