The build process continued
STEP 7
Position the remaining shoes at the centre of the
short base timbers as shown. Do not fix at this stage.
STEP 8
The skimmer panel has two steel shoes. Use the skimmer
support timber to help centre and position the steel shoes.
Do not fix at this stage.
This is for 4x4 and 6x4 pools only
STEP 9
Lay the first row of pool wall timbers
STEP 10
Line up the inside edge of base timber with the first row of
pool wall timbers.
STEP 11
Ensure that the pool wall timbers sit flat onto the base timbers.
STEP 12
Continue assembling the wall timbers, alternately aligning the
corner joints. Make sure the tongues and grooves are in line
before tapping down.
Centre of base timber
Please note:
This is the side where the filtration pack will be positioned.
Tongue
Please note:
Make sure that the skimmer panel timbers
are assembled in the correct order.
4 half width timbers
tongue on top
4 full width timbers
tongue on top, no groove on base
Bottom wall timbers
no groove, tongue only on top
Full width pool wall timber
Half width bottom wall timber
Tongues on top
Full width pool wall timber
Half width
bottom wall timber
Please note:
Dolphin pools do not have upright posts
and steel shoes in the corners