Fitting
OMEGA ACTIVE IES Page 45 of 128
Next drill the holes for the IES into the door.
8.
Fig. 24 - Place the drilling
template
Place the supplied
drilling template over
the spindle.
Align the template
accurately.
Ensure parallel
alignment of the
measuring scale on
the template.
9.
Fig. 25 - Mark the holes
Mark the holes for the
fixing screws with an
awl on both sides of
the door.
10.
Fig. 26 - Remove the lock
Remove the lock.