background image

 

 

MAXI Cooling 

Operating instructions 

  

4 Feb 2019 

Page 1 of 2 

General information 

Cetetherm MAXI Cooling is a district cooling 
substation designed to connect buildings to 
district cooling networks.  

The standard version of MAXI Cooling is used for 
primary connection (indirect connection) to a 
district cooling network. Other variants of 
connections to different sources exists. 

See the flowchart in the delivery documentation 
for detailed information about the equipment and 
how to connect it. 

See the identification plate for technical data. 

Operation 

The main component is one or more heat 
exchangers which separate the high pressure 
district cooling water from the secondary water 
systems of the building. 

These heat exchangers have peripheral 
equipment such as a control centre, control 
valves, pumps and valves, which together form a 
working district cooling substation. 

The heat exchangers have a high heat transfer 
capacity in order to make efficient use of the 
temperature of the district cooling water.  
This results in economical cooling. 

MAXI Cooling has been developed with well-
planned pipework and with all components easily 
accessible for inspection and servicing. 

After installation and adjustment, MAXI Cooling 
operates completely automatically. Normally the 
temperature of the secondary circuit is regulated 
towards a fix value. It can also be in relation to 
the outside temperature.  

OBServe that the secondary setpoint should 
never be so close to the district cooling so that  
 
control valves open 100% (Except if conditions 
are exactly like in design specs).  
 
Scheduling of different setpoints can be efficient, 
if also surrounding equipment have the same 
settings and scheduling, like bypasses, 
ventilation circuits etc. 

The goal is good indoor climate and comfort in a 
building. The District cooling subs the 
complete secondary side equipment design, 
setting and function need to work together to 
achieve this. 

Cleaning of unit:  

Before cleaning the heat exchangers with any 
liquid, check that the liquid is not aggressively 
corrosive to any of the materials that it comes in 
contact with. 

-Before returning the substation to use, flush the 
out all traces of the cleaning. 

Safety equipment and inspection 

- Every three months: check the safety valve 
and the pressure in the secondary system. 

– Daily inspection: check for leaks from pipes 
or components. 

– Weekly: check that temperature control 
works without “hunting”. Temperature hunting 
wears valves, actuators and heat exchangers. 

For instructions on preventing hunting, see the 
troubleshooting chart on the next page. 

To check the operation of the safety valve, turn 
its wheel/knob until water escapes from the 
waste pipe of the valve, then close the 
wheel/knob quickly.  

To fill the secondary system manually, open 
the filling valve. Be sure to close the valve 
when the correct pressure is reached. (This 
depends on the type of system and the 
building.) 

Make sure that supplied or after- mounted 
safety equipment works properly, is set 
correctly and have the right effect. 
 
Automatic filling/pressure-keeping should be 
checked to ensure that the correct pressure is 
maintained. 

Cold water contains a large amount of 
dissolved oxygen. Using this water to fill 

Reviews: