Models EW0820
Installation, Operation and Maintenance
Page 6
Rev 2/12/19
EW-IOM-A.doc
Installation Procedure
S
AFETY
R
EQUIREMENTS FOR
I
NSTALLATION
AND
S
ERVICE
Refer to ANSI/ALI ALIS (current edition)
I
MPORTANT
: Always wear safety glasses while
installing lift.
T
OOLS
&
S
UPPLIES
(
MINIMUM REQUIRED
)
In addition to the components furnished with the
lift, certain tools, equipment, supplies and
materials are required. The installer or
purchaser of the lift must furnish following items:
A. Forklift, cherry picker, crane, winch
truck, chain falls, winches, or hoist to
unload and erect lift
B. Machinist level, or four-foot carpenters
level to check cylinder plumb
C. Drywall Square, chalk line, 16ft Tape
Measure, or transit for bay layout
D. Wiring, conduit, wiring devices for
electrical power supply, Shop Air supply
with filter lubricator
E. Hand tools for lift assembly
F. Two 6”x6” wood beam or Channel to
suspend the lift during install
G. Four M16-2.0 x 45cm lg Threaded Rod
H. Twelve M16-2.0 Nuts and Eight M16
Washers
I.
2" sch. 40 PVC for air / hyd. chase
J. 12 Qtz 10wt Dexron III ATF
K. Hydraulic Hose (4000 psi working/16000
psi min. Burst) SAE #6 9/16-18 37°
Female Swivel Both Ends. Fittings must
conform to the SAE J514 Guidelines.
This hose will connect the power unit to
a fitting in the center of the tub. The
length of hose needed to run from the
chase to the fitting is 50inches.
L. 6.25 cu yards of Concrete as the
backfill.
A
CCEPTED OILS
Do not use oils with detergents. Hydraulic fluid is
not provided with the lift shipment
a. -10 wt. anti-foam, anti-rust
hydraulic / biodegradable oil
b. -Dexron III ATF
Location
Locate lift to allow plenty of working room on all
sides. In front of the bay, allow room for
workbenches, aisles, lubrication equipment or
other obstructions. Observe the recommended
minimums,
Fig 2
. Check overhead clearances
as ordinarily 12 feet is ample for automobiles.
The power unit may be installed on the nearest
wall or under work bench. The power unit
should be located out of the working area
around the lift and vehicle, but close enough to
allow good visibility while operating the lift. Mark
cut outs and centerlines on existing floor or
excavation site.
Fig 2 – Block Out and Location
Excavation
Refer to
Fig 2
for dimensions, to saw cut an
existing facility floor or to block out a new
construction floor. Also, it will be necessary
to break out a trench 6"-8" wide by 12" deep
to run the PVC chase. It is recommended to
mark the path and area before cutting. For
excavation dimensions see
Figure 3
. All
depths are measured from the finished floor
level. Failure to comply will void the
warranty. Hydraulic and air lines from the lift
should be recessed under the slab in a 2”
sch. 40 PVC chase.
Summary of Contents for EnviroLift EW0820S090
Page 21: ...Model EW0820 Installation Operation and Maintenance Page 21 Rev 2 12 19 EW IOM A doc NOTES ...
Page 22: ...Model EW0820 Installation Operation and Maintenance Page 22 Rev 2 12 19 EW IOM A doc NOTES ...
Page 23: ...Model EW0820 Installation Operation and Maintenance Page 23 Rev 2 12 19 EW IOM A doc NOTES ...