POSITION OPERATOR ON MOUNTING LOCATION
Before proceeding, begin with the gate in the fully closed position. The post bracket assembly can be mounted
several places on the gate post. Refer to the illustrations on page 9 for the ideal mounting options.
With gate in closed position, place operator against gate post at the desired vertical position.
•
The bottom of the operator must be at least 4" off the ground.
•
Temporarily secure the post bracket to the post and the gate bracket to the gate with the clamps.
•
Ensure the operator is level by placing the level on the bottom of the operator.
•
Ensure there is at least 1/4" space between the operator and the extension bracket. If needed the extension
bracket can be adjusted to achieve this gap. The 5-1/2" x 5-1/2" marked location may not be exact in
all installations.
Hairpin Clip
Hairpin Clip
Gate Bracket
Post Bracket
ATTACH BRACKETS TO GATE OPERATOR
Attach post bracket and gate bracket to the gate operator using the pin and the hairpin clips as illustrated.
4
5
Pin
5-1/2" Marked Location
15
Installation
Clamp
Gate Operator
Gate Bracket
1/4" Gap