Manual Operation and System Check-Out
Doc 01-G0665
Rev C
Manual Operation and System Check-
Out
SW470 Manual Gate Operation
Remove the (2) black plastic knobs which secure the control arm assembly to the operator. The gate
will swing freely when the arm assembly is removed.
Preliminary System Check Out
Before adding any options, accessories or adaptions, it is highly recommended that you check out the
system and its programs. If you have not already done so, temporarily connect a three button station
to the operator. Test for proper open, stop and closing of the gate. Test the internal obstruction
sensor system. Test for proper operation of all programs that were programmed into the system.
Once everything checks out okay, then proceed to adding on the accessory items for this job site.
IMPORTANT NOTES:
We recommend that, if more than one accessory item is used, after
each one is attached check it for proper operation before adding the next.
Make sure that the two (2) gate warning signs are secured to the gate. One on the inside and
one on the outside. They
must
be easily seen.