16
NOTE:
Use copper conductors ONLY.
OPERATOR POWER SOURCE
DIRECT PLUG-IN TRANSFORMER (120 VAC)
Wire Gauge 14
1150 feet (351 m)
Wire Gauge 12
1850 feet (564 m)
Wire Gauge 10
2950 feet (899 m)
OR
EXTERNAL PLUG-IN TRANSFORMER (24 VAC)
Wire Gauge 18
150 feet (46 m)
Wire Gauge 16
250 feet (76 m)
Wire Gauge 14
400 feet (122 m)
Wire Gauge 12
600 feet (183 m)
Wire Gauge 10
1,000 feet (305 m)
STEP 7
EARTH GROUND ROD
Use the proper earth ground rod for your local area. The ground wire
must be a single, whole piece of wire. Never splice two wires for the
ground wire. If you should cut the ground wire too short, break it, or
destroy its integrity, replace it with a single wire length.
1. Install the earth ground rod within 3 feet of the operator.
2. Run wire from the earth ground rod to the operator.
NOTE:
If the operator is not grounded properly the range of the remote
controls will be reduced and the operator will be more susceptible to
lightning and surge damage.
Check national and
local codes for
proper depth
To Operator
INSTALLATION
STEP 8
POWER WIRING
This operator can be wired for either 120 Vac or a solar panel (not
provided). Follow the directions according to your application. For dual
gate applications, power will have to be connected to each operator.
Main power supply and control wiring MUST be run in separate
conduits.
The battery is charged in the circuit by the integrated transformer. The
operator requires one 7AH battery (provided) or one 33AH battery. The
33AH application requires the 33AH wire harness (Model K94-37236).
SOLAR APPLICATIONS: For solar applications refer to Solar Panels
section in the Appendix. Follow the directions according to your
application.
To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the operator
MUST NOT be performed until disconnecting the electrical power
(AC or solar and battery) and locking-out the power via the operator
power switch. Upon completion of maintenance the area MUST be
cleared and secured, at that time the unit may be returned to service.
• Disconnect power at the fuse box BEFORE proceeding. Operator
MUST be properly grounded and connected in accordance with
national and local electrical codes.
NOTE:
The operator should be on
a separate fused line of adequate capacity.
• ALL electrical connections MUST be made by a qualified individual.
• DO NOT install ANY wiring or attempt to run the operator without
consulting the wiring diagram.
• ALL power wiring should be on a dedicated circuit and well
protected. The location of the power disconnect should be visible
and clearly labeled.
• ALL power and control wiring MUST be run in separate conduit.
Summary of Contents for RSW12U
Page 2: ......