Rev J
Doc 01-20098
Page 10 of 44
B. MOUNTING GATE OPERATOR
1. Mounting Unit On Pad
WARNING
To avoid injury, always turn off the unit power switch before working on gate.
Figure 8. Mounting.
Figure 9. Chain Height.
1. Remove the 4 protective bolts that hold the cover on, lift the cover off, and set aside.
2. Remove the assembly kit and parts.
3. Remove the 4 bolts that attach the gate operator to the shipping pallet.
4. Mount gate operator on the cement pad using the previously installed anchors. Be
sure the operator mounting is level and the chain face is parallel to gate movement
(Figures 8 and 9).
5. Move the idler wheel mounting if required by this specific installation.