Rev J
Doc 01-20098
Page 23 of 44
N. FINAL ASSEMBLY OF GATE OPERATOR
Figure 18. Gate Operator Final Assembly.
IMPORTANT SAFETY PROCEDURE
1. Install clear cover on gate operator control box.
2. Make sure that gate operator unit power switch is turned on.
3. Install gate operator cover and secure with four bolts.
4. Turn on power to the gate operator at the circuit breaker.
5. Cycle the gate to ensure it is operating properly.
Gate Operator
Cover (in place)
Clear Plastic
Cover
Control
Box
Cover
Mounting
Bolt
(4 places)
Gate Operator
Cover