9
REV 92221-20120417
ENGLISH
92221
5) Install the Cylinder and Wedge
1 . Place the wedge on the beam between the cylinder
mounts and slide it forward into the rails . (A)
2 . Remove the cylinder mounting plates . (A)
3 . Install the cylinder by sliding the pegs at the end
of the cylinder into the mounting slots on top of the
beam . Be sure to slide the cylinder all the way back
into the mounting slots . (B)
ASSEMBLy
C
d
A
4) Install the Beam Cont’d.
5) Install the Cylinder and Wedge Cont’d.
6) Install the Engine and Hoses
1 . Attach the engine/pump to the engine mounting plate on
the hydraulic oil tank . (A) Secure with hardware provided .
2 . Place O-ring into the outlet fitting on the top of the
pump . (A)
3 . Connect hose to control valve first, then connect
the other end to the pump . Connect one end of the
high pressure hose to the pump outlet fitting and the
other end to the inlet on the control valve . (B)
5 . Hold the top of the beam by the cylinder mount and
carefully rotate the beam toward the tow bar .
6 . Once the bracket on the bottom of the beam is aligned
with the tow bar, secure with pin and R-pin . (D)
The cylinder will support itself when slid all the way
back into the mounting slots .
NOTE
4 . Secure the cylinder mounting plates with hardware
removed in step 2 . (B)
5 . Slide the wedge back toward the cylinder and align
the bolt hole in the wedge with the bolt hole in the
cylinder rod . (B)
6 . Secure the wedge to the cylinder rod with an
M12x75 bolt and M12 nut . Lightly tighten the nut to
approximately 5 ft-lb . (B)
The cylinder rod may need to be rotated slightly
in order to properly align the the wedge . Insert a
screwdriver into the bolt hole in the cylinder rod
and slowly rotate as needed .
NOTE
3 . Slowly lift the front of the tow bar to roll the frame
toward the beam and carefully align the pivot holes
on the bottom of the beam and the top of the
hydraulic oil tank .
4 . Once aligned, secure the beam to the tank with hitch
pin and R-pin . (C)
B
B