24
Pulper/Water Extractor - Operation
Operation
Refer to the Theory of Operation and Waste Handling Precautions beginning on
page 1 of this manual prior to operating the waste handling system.
1. Turn on main power supply and water supply.
2. Make sure all drain valves are closed.
3. Inspect the interior of the pulper tank for metal or other debris.
4. Inspect the interior of the water extractor and make sure it is clean.
5. Check the (optional) deodorizer chemical container and replenish as necessary.
6. Open the water extractor discharge chute and make sure that the top of the water extractor
and especially the space directly under the compression cone is clear of any obstructions.
7. Fully close the discharge chute and place a refuse container under the chute.
8. Make sure the safety switch on the water extractor and the pulper are in place and secure.
9. Make sure all access doors, feed hoods, curtains and covers are in place and secure.
10. Make sure all personnel are standing away from the waste handling system.
11. Turn the Main Circuit Breaker Switch on the remote control cabinet to the ON position.
The Power On light illuminates and the pulper fills with water.
12. Push the green Start push button on the Water Extractor.
A. The pulper drive motor and the water extractor drive motor will run.
B. The optional recirculating pump motor (if equipped) will run.
13. If equipped, push the (optional) deodorizer switch ON. The switch is located on the remote control
cabinet.
14. Feed a combination of food waste, paper waste, and cardboard into the pulper. Cardboard boxes must
be reduced in size before loading.
15. Push the red Stop push button on the water extractor to Stop the system.
16. In case of an emergency, the system also can be turned off by rotating the Main Circuit Breaker Switch
on the remote control cabinet counter-clockwise (CCW) to the OFF position.
Main Circuit Breaker Switch
in the OFF position
Main Circuit Breaker Switch
in the ON position
Start/Stop Station
OFF.
Start/Stop Station
ON.
Summary of Contents for P5-24
Page 9: ...Introduction Introduction 1 ...
Page 17: ...9 Installation Installation ...
Page 31: ...23 Pulper Water Extractor Operation Operation ...
Page 33: ...25 Cleaning and Maintenance Pulper Water Extractor Cleaning and Maintenance ...
Page 38: ...30 Blank Page This Page Left Intentionally Left Blank ...
Page 64: ...56 Feed Trough Gaskets Pulper 1 3 4 4 5 2 Feed trough supplied by others ...
Page 69: ...61 Electrical Schematic Electrical Schematic Remote Control Cabinet Component Selection Chart ...
Page 70: ...62 Blank Page This Page Intentionally Left Blank ...