7
8
•
Attach
LH
and
RH Front Shelf Brackets
to the firebox using 4 each
1/4-20" Shoulder Bolts
and 4 each
1/4-20
flange nuts.
•
After the front shelf brackets are secured, attach the
front shelf slats
to the brackets using 4 each
1/4-20x1 1/4
screws
and 4 each
1/4-20 flange nuts.
1/4-20 Flange Nuts
1/4-20x1 1/4
Screws
1/4-20 Shoulder
Bolts
1/4-20 Flange Nuts
1/4-20 Flange Nut
1/4-20 Flange Nut
1/4-20x1 1/4
Screws
1/4-20x1/2
Screws
Page 11
A
- Attach
Side Shelf Brackets
to LH side of firebox using 4 each
1/4-20x1/2
screws and 4 each
1/4-20 Flange nuts
.
B
- Attach
Side Shelf Slats
to Side shelf brackets using 6 each
1/4-20x1 1/4"
screws and 6 each
1/4-20 flange nuts.
NOTE: The Side Shelf may be pre-assembled, if so attach the Side Shelf per Step A.