17
18
16
Install grill lid on grill base using two M6 x 15mm shoulder bolts.
Install Towel hooks onto the towel bar as shown.
First remove the two M6 nuts that are pre-assembled to the towel bar, then install the towel bar to the smoker chamber and
secure with two M6 nuts.