Marking utensil 

 

#6 ground wire or rod and earth ground materials 

 

Bond straps 

 

Any exterior cable strain relief, per company practice 

 

Socket wrenches, slotted and Phillips screwdrivers 

 

Assorted cable ties 

 

Can wrench (216 tool) 

 

Level 

3.4

 

Preparing the Installation Site 

Observe the following site preparation recommendations: 

 

Leave adequate horizontal and vertical space between multiple installations to allow for proper cable access, as well as enough 
room to remove dome.  

 

The site must meet minimal personnel and equipment safety requirements. 

 

The  distance  from  the  cable  entry  point  should  be  consistent with local installation practices. 

 

Run all cable facilities to the site. 

3.5

 

Lifting the Enclosure 

The enclosure is manufactured from HPDE with aluminum internal brackets. It is designed with a 2-section dome for reduced lifting 
weight. In most instances, one individual should be able to lift and move the individual enclosure components at the job site. 

3.6

 

Installing the Enclosure In-Ground 

-NOTE- 

When installed in-ground, confirm appropriate locate service has been completed before digging

 

The enclosure is designed to be direct buried using two mounting stakes (Figure 3).  

1.

 

Review installation site map and be aware of any locate flags or markers before beginning excavation. 

2.

 

Mark the location of the enclosure, approximately 4” larger than the overall base. Remove the top layer of the soil.  

3.

 

Being careful not to damage the cables or conduits, using the ground line located on the enclosure base with the expected finished 
grade, dig straight down to the proper depth +1”.  Dig additional depth at location of mounting stakes.  

4.

 

Install pea rock (user supplied) to the depth of ~1” in the excavated hole and tamp level. Be careful not be fill the stake holes with 
rock. Temporarily place the enclosure into position, checking to ensure the enclosure is level in two directions (front to back and 
side to side). Add additional pea rock until level. 

5.

 

Install two enclosure stakes (part number detailed in Table 2) using the mounting hardware provided with the stake or enclosure. 
The stake should be positioned against the inside of the u-support uprights of the enclosure with the bolt’s threads facing the 
inside.   

6.

 

Lift the enclosure into position, over installed cables. Using a level, confirm the enclosure is level in both directions. If the 
enclosure is not level, remove the enclosure and add backfill to the hole, tamping down to prevent settling. Repeat until level and 
plumb. 

7.

 

Ensure the cable conduits are sealed/plugged. Alternate backfilling the outside of the excavated area and the inside of the area 
with soil, tamping at 2” increments. 

8.

 

Backfill the inside of the base with soil to between the 2nd are 3rd 
base rib. Spread the RED plastic moisture barrier sheet (included with 
enclosure) on top of the soil, slitting the sheet to allow access for 
cables and conduits.  Make sure the plastic sheet covers the entire 
area. This sheet prevents additional moisture from building up in the 
enclosure.  

9.

 

Finish by adding ~3” to 4” of pea rock (gravel). 

 

 

Figure 3 

Interior Base Backfill 