www.charltonandjenrick.co.uk
25
LT7271 (ISS2)
SECTION NINE To Install the Appliance (Installation Instructions)
CHECKING THE FLUE AND FIRE OPENING
Check that the chimney conforms to the required specifications as previously stated. Examine the condition
and carry out any remedial work including removing any debris from the base.
If the flue has been used for solid fuel it should be swept prior to the installation
Prior to installing the appliance a smoke test (using a smoke bomb) should be carried out to check that
satisfactory smoke clearance has been established.
If all the smoke is not drawn into the flue, pre-heat the flue with a blowtorch or similar and re-check. If there is any
uncertainty examine for the cause and, if necessary, seek expert advice.
No combustible material should be fitted inside the fireplace opening.
GAS SUPPLY ROUTING :-
Use rigid or semi – rigid tube to connect the supply. Determine the gas supply pipe route to the appliance before
installing the Stove.
Check the gas run to assess that the gas supply is capable of providing the required amount of gas and is in
accordance with the rules in force.
Soft copper pipe can be used to install the appliance. Soldered joints can be used only externally of the appliance.
The appliance is supplied with a factory fitted isolation device to allow for an 8mm copper connection. No further
isolation point is required.
The new gas line must be purged of any debris, prior to final connection to the appliance.
Gas inlet isolation device is located on bottom left hand side of the fire box, the gas supply entry point is positioned
at the rear bottom on left hand side. With the appliance fixing kit is a 35mm round seal (Please see fig 3), this
should be cut and fitted over the 8mm copper at the point the gas supply entry into the appliance assembly. The gas
inlet cover will need to be removed to gain access to the connection. (Please see fig 4).
The gas inlet isolation device must be angled to allow access to the grub screw and gas test nipple. (Please see fig 3).
Summary of Contents for PV5W
Page 12: ...12 LT7271 ISS 2 Log Fuel Bed Layout ...
Page 13: ...www charltonandjenrick co uk 13 LT7271 ISS2 ...
Page 14: ...14 LT7271 ISS 2 ...
Page 15: ...www charltonandjenrick co uk 15 LT7271 ISS2 ...
Page 22: ...22 LT7271 ISS 2 ...
Page 32: ...32 LT7271 ISS 2 ...