19
Operations
Product Manual - Orca
™
CO
2
Series MicroBulk Delivery System
20
Close receiving tank fill valve and re-open Dispense
(V-41) valve to allow liquid in hose to warm and travel
back into Orca CO
2
21 Close Vapor Balance (V-41) and receiving tank vapor
balance valves Open and close Vapor Balance Line
Drain (V-45) valve to depressurize
22 On Chart printer-equipped models
a Open printer box, press RELEASE to insert paper into
printer, press FORWARD to lock paper in
b On Flowcom, press EXIT, PRINT When printing is
complete, press printer RELEASE, remove paper and
close door
23 On Flowcom press CLEAR, CLEAR, and DELIVERY
to return to deliver screen
Note: This prepares the Flowcom for the next
delivery.
24
Power off Flowcom. This also powers off the printer.
25 Close Dispense (V-41) valve Open line drain at
receiving tank and shake hose to get all liquid out
26 Once de-pressurized, open Dispense Line Drain (V-8) to
ensure hose is empty and de-pressurized
Caution! Use best practices to properly
drain the liquid and keep from
forming pressurized dry ice
plugs.
27 Disconnect CGA size adapter, bulk delivery hose and
stow
a Reconnect Hose Reel Delivery Flex Hose (DC-3),
open Dispense (V-41) & Delivery Flex Hose (V-47)
valves
b Optional: purge and pressurize per “
VI Pressure
Delivery 6 . a .”
28 Close cabinet doors and stow hoses Replace all dust
caps
29 Disengage engine speed control and disengage PTO
30
Keep pressure build heater running or turn off as
necessary
Note: This procedure can also be used for
pump transferring through the Hose Reel
Flex Hose instead of the bulk hose.
Note: Use CGA fitting 1.0”-1.5” size adapters
as necessary.
Note: To fully empty Orca CO
2
, dump the truck
air bags or park so the back of the Orca
CO
2
is lower than the front.
VIII. Receiving Tank Commission:
Hose Reel
— Follow steps 1-4 in
“VI . Pressure Delivery”
for
pre-delivery instructions
1 Connect Hose Reel Inlet (DC-3) to Vapor Balance (DC-
5)
2 Open Vapor Balance (V-44) and Delivery Flex Hose
(V-47) valves
3 Connect Hose Reel Dispense (DC-4) to receiving tank
fill.
4 Open Delivery Hose (V-46) valve and pressurize tank to
100 psig
5 Close Delivery Hose (V-46), Vapor Balance (V-44) and
Delivery Flex Hose (V-47) valves
6 Open Vapor Balance Line Drain (V-45) valve and close
when depressurized Replace dust cap on Vapor Balance
(DC-5)
7 Disconnect Hose Reel Inlet (DC-3)
8 Refer to
“VI . Pressure Delivery”
for further
instructions
IX. Tank Commission: Bulk Hose
— Follow Steps 1-4 in
“VII . Pump Delivery”
for
pre-delivery instructions
1 Connect Bulk Transfer Hose to Vapor Balance (DC-5)
and receiving tank fill connection.
2
Open Vapor Balance (V-44) and receiving tank fill
valves Pressurize receiving tank to 100 psig
3
Close Vapor Balance (V-44) and receiving tank fill
valves
4 Open Vapor Balance Line Drain (V-45) and close when
depressurized
Summary of Contents for Orca MicroBulk CO2 Series
Page 2: ......
Page 13: ...Safety 7 Product Manual Orca CO2 Series MicroBulk Delivery System...
Page 14: ...8 Safety Product Manual Orca CO2 Series MicroBulk Delivery System...
Page 28: ...22 Operations Product Manual Orca CO2 Series MicroBulk Delivery System...
Page 42: ...36 Components Systems Product Manual Orca CO2 Series MicroBulk Delivery System...
Page 48: ...42 Troubleshooting Product Manual Orca CO2 Series MicroBulk Delivery System...
Page 54: ...48 Specifications Product Manual Orca CO2 Series MicroBulk Delivery System Piping Schematic...
Page 55: ...49 Specifications Product Manual Orca CO2 Series MicroBulk Delivery System Nomenclature...
Page 62: ...Product Manual Orca CO2 Series MicroBulk Delivery System...