86
CLEANING, MAINTENANCE, OVERHAUL
EN
INTELECT
®
RPW 2 USER MANUAL
9. Take out the new guide tube and the new projectile from
the overhaul kit.
10. Insert the guide tube into the opening in the shaft by
pressing in until the stop.
IMPORTANT: Make sure that the end of the guide tube
where the two air slots are located is in the direction of the
handpiece handle.
11. Insert the new projectile into the fitted guide tube.
12. Screw the shaft into the handpiece until finger-tight.
• Using one hand, press the handpiece firmly onto
the table and tighten the shaft using the open-end
spanner. It must no longer be possible to unscrew
the shaft by hand.
13. Screw the transmitter screw cap with the required
transmitter firmly back onto the shaft.
• For two-part transmitter caps: Make sure that the
two cap parts are screwed firmly in place and that the
transmitter screw cap is screwed firmly to the shaft.
• Carry out a functional check of the handpiece
Summary of Contents for Intelect RPW 2
Page 32: ...32 USER INTERFACE EN INTELECT RPW 2 USER MANUAL Select transmitter ...
Page 50: ...50 USER INTERFACE EN INTELECT RPW 2 USER MANUAL Delete one session ...
Page 55: ...55 USER INTERFACE EN INTELECT RPW 2 USER MANUAL Delete one protocol ...
Page 61: ...61 USER INTERFACE EN INTELECT RPW 2 USER MANUAL 4 Full screen image Close full screen mode ...