880-0030-76A QA Measures in Production of
ChemoMetec Cassettes
Doc. No. +Vers.
880-0030-76A v 3
Date
19-Jun-2018
Owner
IAP
Approved by
ELL
Document no: 880-0030-76A
Version: 3
Page
6
of
7
CONFIDENTIAL
Flow Chart of the Production 1 of 2:
Customer demand
for cassettes
Current inventory status is checked and the prodution
schedule is updated by the Production Manager
Entrance control of raw material
The new prodution schedule is sent to the
production team, logistics and QC
Production initiated
Line 1: Reagent Dispensing
Dispensing of
reagent and placement of porex in the
cassette flow par
t
Raw material availability is checked
Raw material is ordered
Reject
A supplier error report is
created and the rejected
lot is returned to the
supplier or discarded
Non-conforming material is discarded
Available
Rejects
Inspection OK
Inspection OK
Flow parts with porex a
n
d reagent is
automatically transferred to a driyng
tunne
l
Page 25 of 127
Summary of Contents for NucleoCounter NC-202
Page 1: ...997 0005 NucleoCounter NC 202 Document Compilation V 1 0 Page 1 of 127...
Page 14: ...Page 14 of 127...
Page 15: ...Page 15 of 127...
Page 16: ...Page 16 of 127...