Chery QQ Service Manual 465 Engine Mechanical System
- 28 –
Chery Automobile Co., Ltd
the fuel pipe with spring clamp after making
marks.
11. Remove all kinds of hose from intake
pipe assembly
12. Remove construction bolt of intake
manifold.
13. Remove intake manifold and gasket
from cylinder for clean.
Clean intake manifold and cylinder head
gasket
II
Procedures of installation
1 Use the new gasket between the intake
manifold and cylinder head.
2 Position fix and installation must be
accurate.
3 Connect warm blow hose and vacuum
valve with intake and intake manifold.
4 Reconnect fuel pipe after making mark.
5 Connect throttle position sensor plug
。
6 Connect idle vacuum valve plug
。
7 Connect power source of injector.
8 Connect power source of coolant
temperature sensor.
9 Pay attention to the wire path.
10 Connect vacuum booster and intake pipe.
11 Install throttle bracing wire and driving
belt of accessories
13 Connect intake hose and crankshaft vent
pipe to intake pipe
14 Connect temperature sensor connector
。
15 Connect battery negative pole
。
16 Exhaust the cooling system.