5
Operating instructions
5.1
Initial start-up
Safety
The operator must apply all relevant
Procedure
For the position of the air outlet valve and the drain connections, see sections
.
1. Consult the sections
Electric cable size, Installation proposal
2.
The following transport fixtures, painted red, must be removed:
• Bolts on service door (B)
• Supports (1)
Instruction book
54
2920 7101 41
Summary of Contents for CPC 40 G
Page 2: ......
Page 128: ......
Page 129: ......
Page 130: ...No 2920 7101 41 2014 12 Printed in Belgium People Passion Performance www cp com ...