5.
Hand tighten two M6x50mm socket head cap screws (K) into
top two holes on display and interface plate. (See Figure 10)
IMPORTANT ! :
Top two screws must be installed prior
to installing the bottom two screws in order to ensure
interface holes are properly aligned with holes on display!
Figure 9
6.
Hand tighten two M6x60mm socket head cap screws (L).
into lower two holes on display and interface plate. (See
Figure 10)
7.
Tighten top two screws (K). (See Figure 10)
8.
Tighten bottom two screws (L) while holding display in a
vertical position. (See Figure 10)
NOTE:
It is important to ensure the display is aligned vertically
when tightening all screws.
WARNING:
Using screws of improper length or diameter
may damage display! Only use screws provided with mount!
Figure 10
Storage Shelf Installation
1.
Use four 1/4-20 x 3/4" button head cap screws (H) to secure
pole attachment plate (G) to storage shelf (F). (See Figure
11)
NOTE:
If planning on using the column for cable management,
be sure to install shelf assembly over the cable
management opening on column.
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! The
combined weight of all components stored within or on the
storage shelf cannot exceed 25 lbs (11.3 kg).
Figure 11
Cable Management
1.
Connect all cables to display.
2.
The display power cord can be run through the top and
down through the post to exit out the back. (See Figure 12)
Figure 12
5
(K) x 2
(MX300 install)
6
(L) x 2
7
8
(MX300 install)
(H) x 4
1
(G)
(F)
2
2
(rear view of cart)