background image

Model PDR™

Installation Instructions

4

Inspect The Unit Before Installing

WARNING:

Watch for pinch points. Do not put your

fingers between movable parts.

1.

Carefully inspect the PDR for shipping damage. If any
damage is apparent, call your carrier claims agent
and do not continue with the installation until the
carrier has reviewed the damage.

NOTE:

Read all instructions before starting installation.

2.

Lay out components to ensure you have all the
required parts before proceeding
(see “DIMENSIONAL DRAWING” on page 3).

SPECIFICATIONS

Table 1 provides the specificiations for the mount.

NOTE:

*Dimension does not include the PSB interface

bracket.

INTERFACES

Table 2 lists the interface for the PDR.

TOOLS REQUIRED FOR INSTALLATION

Allen wrench set

Drill and bit set

Wrench set

NOTE:

Other tools may be required depending on the

method of installation.

PARTS LIST

Unpack the carton and verify the contents listed in Table
3.  If you are missing any of the listed parts, contact
Customer Service at: 1-800-582-6480.

Table 1:

Mount Specifications

Model

Max Support Weight

Mount
Extended
from Wall

PDR

 200 lbs. (90.72kg)

37”

*

Table 2: PDR Interfaces

Model

Interface

PDR

14” x 14” STD Plasma Static Brackets (PSB)

Table 3: Parts List

REF

DESCRIPTION

QTY

10

PDR Wall Mount

1

20

Cover Plates

2

30

End Caps

4

40

Tiewraps

12

Lag Bolts, 5/16” x 2 1/2”  (required, not
supplied)

4

Flat Washers, 5/16”  (required, not supplied)

4

Wrench, Adjustment

1

Bar, Adjustment

1

Summary of Contents for PDR

Page 1: ...p and 15º down The PDR was designed for fast installation After drawing the plumb line and installing the two top lag bolts into the dual wall studs the installer hangs the PDR on its top bracket and installs two lag bolts in the bottom bracket Next the installer makes the height adjustment installs the plasma screen and routes the power audio video cables down the built in path in the swing out a...

Page 2: ...xceed 200 lbs 90 72 kg the maximum load capacity of the PDR WARNING Watch for pinch points Do not put your fingers between movable parts WARNING Make sure the mount and brackets are correctly oriented WARNING Make sure the flag securing the display is completely lowered at all times except when removing or installing the display CAUTION Check the unit for shipping damage before you begin the insta...

Page 3: ...Installation Instructions Model PDR 3 DIMENSIONAL DRAWING ...

Page 4: ...lude the PSB interface bracket INTERFACES Table 2 lists the interface for the PDR TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools may be required depending on the method of installation PARTS LIST Unpack the carton and verify the contents listed in Table 3 If you are missing any of the listed parts contact Customer Service at 1 800 582 6480 Table 1 Mo...

Page 5: ... plumb line to indicate the desired height of the top mounting bracket 5 With an assistant lift and hold the PDR against wall Use a pencil awl or small nail to mark the mounting holes where two pilot holes will be drilled into the center of the wood studs Make sure the mounting holes are level 6 With an assistant lay the PDR down on the floor 7 Drill two pilot holes where the mounting holes were m...

Page 6: ...two mounting holes in the bottom mounting bracket See figure 3 Make sure to align the holes parallel to the holes drilled in the top bracket 2 Drill two pilot holes in the wall studs as follows If using 5 16 lag bolts use a 7 32 drill bit If using 3 8 lag bolts use a 9 32 drill bit 3 Install two lag bolts and two washers into the pilot holes If you used a 7 32 drill bit use 5 16 lag bolts and 5 16...

Page 7: ...nit height or Turn adjustment nut counterclockwise CCW to raise the unit height Install Cover Plates and End Caps NOTE The cover plates and end caps have pressure fitting ends that lock in place with each other 1 Install cover plate 20 over the top bracket see Figure 5 2 Install end cap 30 on the cover plate 20 3 Repeat steps 1 and 2 for the bottom mounting bracket Figure 4 Adjust PDR Height Figur...

Page 8: ...ling or positioning display on stand 4 Lower display into place listening for audible click to ensure recessed area of mounting buttons are properly seated in lower area of mounting holes See Figures 6 and 7 WARNING IMPROPER INSTALLATION CAN LEAD TO DISPLAY FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT Ensure mounting buttons are completely engaged in mounting holes NOTE Holes are...

Page 9: ... power audio video cables along bottom arm See figure 9 using tiewraps 50 to secure cables to each arm and through cable channel CAUTION To prevent equipment damage do not route cables through holes in the display mounting plate 3 Route power audio video cables to an open area behind the mounting plate not shown Leave a sufficient amount of slack in cables to allow for connection and extension whe...

Page 10: ...nsion is obtained Rotational Tilt Tension Adjustment 1 If necessary loosen or tighten bottom rotational tilt tension adjustment nut See figure 12 2 Mount the display and check for desired rotational tilt tension 3 Repeat Steps 1 and 2 until desired rotational tilt tension is obtained Figure 12 Lateral and Rotational Adjustment Swing Arm Adjustments The dual swing arms are shipped installed in the ...

Page 11: ...ounting brackets Reconfiguring the Swing Arms Right of Center With some disassembly and reassembly you can move the swing arms to the right of center by reconfiguring the mount Use the third and fifth slotted holes in the top and bottom mounting brackets Adjusting the Swing Arms Off Center To adjust the dual swing arm mount configuration 1 Remove the display from the mount 2 Loosen four bolts two ...

Page 12: ...rom the mount The arms and plate may fall if you are not careful 3 Move the swing arm assembly to desired location For Left of Center see Figure 14 For Right of Center see Figure 15 4 Install retaining pin assemblies one top and one bottom and secure using two bolts one top and one bottom 5 Install four bolts two on the top and two on the bottom to secure the swing arm assembly to the top and bott...

Page 13: ...sitioned in order to gain access to the tension adjustment screw s 3 Using the wrench provided with the mount turn adjustment bar clockwise to increase swing arm tension or counterclockwise to reduce swing arm tension See figure 17 and See figure 18 NOTE Small adjustments of 1 8 turn or less are typically all that is required to achieve desired tension 4 Check swing arm tension If desired tension ...

Page 14: ...and press pin down into Open position See Figure 19 WARNING DISPLAY MAY WEIGH IN EXCESS OF 40 LBS Always use two people and proper lifting techniques when installing or positioning display on mount 3 Carefully lift display from mount 4 Lift up on pin and place flag back against faceplate to return it to Closed position Figure 19 2 1 Remove bolt or padlock if used Pin in Open position Pin in Closed...

Reviews: