Model PNR™
Installation Instructions
6
Install the Mount
Mounting the top bracket
WARNING:
Improper installation can result in serious
personal injury!
1. With an assistant, lift and hang the PNR on the two lag
bolts and washers previously installed on the wall.
(See figure 2).
NOTE:
Make sure washers are installed in front of the
top bracket, not behind the bracket.
2. Slide the PNR into the desired position on the wall
and tighten the two lag bolts.
Mounting the bottom bracket
1. Mark the two mounting holes in the bottom mounting
bracket (See figure 3). Make sure to align the holes
parallel to the holes drilled in the top bracket.
2. Drill two pilot holes in the wall studs using a 7/32” drill
bit.
3. Install two 5/16” x 2 1/2” lag bolts and two 5/16”
washers through PNR Bottom Bracket into the lower
pilot holes.
NOTE:
Lag bolts and flat washers are not supplied.
4. Tighten all lag bolts.
Figure 2: Mount Top Bracket
Figure 3: Mount Bottom Bracket
Mount (Hang) the PNR on Lag Bolts
Use Lag Bolts and Washers to Fasten PNR to the Wall
.