SL220-SK5
Service Manual
6
7.
Slide front channels of previously removed projector cradle
forward onto the SL220 bearings. (See Figure 13)
Figure 13
8.
Line up rear spacers with attachment holes on SL220 arms.
(See Figure 14)
9.
Tighten rear spacers.
Figure 14
10. Reconnect grounding strap from inside front of SL220 to
projector cradle, using the Phillips head screw previously
removed. (See Figure 15)
Figure 15
11. Plug in SL220 and verify proper operation.
12. Re-install projector and cabling, using cable tie mounts (D)
and cable ties (F), as required.
13. Test and adjust projector, as required.
14. Return removed rear wall assembly to Chief Manufacturing.
7
Front of
Front Channels
SL220
x 2
9
Rear of
SL220
x 1
10