background image

チコーエアーテック株式会社 

Copyright  CHIKO  AIRTEC  CO.,  LTD.  2009

 

 

 

  11

 

 

 

 

5.3 

各線の色と信号について

Color and signal of each wire 

 
 

 

 

入力 

INPUT

  :①    接点入力 

Contact input 

 

インピーダンス

    Impedance  1.0

Ω

   

 

出力 

OUTPUT

:②〜⑥オープンコレクタ 

Open collector 

 

耐圧

Voltage resistance 50

V  (≦

100

㎜A)

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

線色

 

 

Wire color

 

PIN

 

NO. 

信号名称 

  Signal

 

name 

 

役割 

  Role 

黒 

   

Black

 

 

運転入力信号 

 

Operation input signal 

(

R

e

m

o

te

 s

ig

n

a

ls

 

①と④と⑧を短絡して運転を開始させます

 

 

Short-circuits the wires [1], [4] and [8] to start operation.

 

/

 

  Red/white

 

 

遠隔操作切替信号

 

Remote-control operation 
switching signal 

④と⑧を短絡してリモート操作に移行させます

 

短絡するとタッチパネルの操作はできなくなります

 

Short-circuits the wires [4] and [8] to start remote operation. 

The AT panel is disabled while the wires [4] and [8] are 

short-circuited.

 

/

 

 

Yellow /white

 

 

Gnd

 

 

/

 

Black/White

 

 

運転圧力信号

 

Operation pressure signal 

 

 

O

u

tp

u

s

ig

n

a

ls

 

現在の運転圧力を取り出します

 

Transfers the current operation output. 

アナログ信号

  Analog signal

0

5V

 

インピーダンス

  Impedance

  (≧

4.7

kΩ)

 

 

Red

 

 

フィルタ目詰出力信号

 

Filter clogging output signal 
 

目詰まり信号を取り出します

 

Transfers the clogging signal. 

オープンコレクタ出力

 

Open collector output 

 

Green

 

 

運転出力信号

 

Operation output signal 

運転信号(ONランプ)を取り出します

 

Transfers the operation signal (ON indicator lamp). 

オープンコレクタ出力

 

Open collector output 

/

 

Green/White

 

 

過負荷信号

 

Overload signal 
 

過負荷信号を取り出します

 

Transfers the ” overload “ signal   

オープンコレクタ出力

 

Open collector output 

 

Yellow

 

 

サービス電源

 

Service power supply 
 

サービス電源を取り出すことができます

 

他のケーブルとは短絡しないで下さい。

 

Transfers the service power supply. 
Do not short circuit this wire with other wires. 

DC 

12

 

負荷インピーダンス 

Impedance

(≧

1

kΩ)

 

Summary of Contents for CKU-400AT-HC-V1

Page 1: ...ng saving type clean box that realizes air technology in a compact body ual thoroughly and handle this CKU Series machine correctly so that you can use safely for a long time and enjoy its full perfor...

Page 2: ...losive dust the following substances Flammable substances Gasoline thinner benzene kerosene Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high c...

Page 3: ...ctor 8 4 4 Confirmation before operation SK 250AT 450AT 8 4 5 Operation procedure 9 5 Remote Cable Sold Separately 10 5 1 Electrical circuit diagram 10 5 2 Remote Cable 10 5 3 Color and signal of each...

Page 4: ...room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation may cause electrical parts to fail and may cause an electrical shock 100 Provide sufficient spa...

Page 5: ...when the product recover peration without filter or with a clogged and damaged filter may cause trouble because foreign substances enter the blower Install the filter properly before operating the mac...

Page 6: ...ag Exhaust filter Copyright CHIKO AIRTEC CO 5 Name and Structure of Product Name of main body Standard accessories Collecting Adsorbing fine dust and fumes Protecting the circuit and the electrical pa...

Page 7: ...upply The power supply is single phase supply voltage range is 10 The power cable of 3 m with a grounding plug is included AT panel Operating the product with a different power supply may cause burst...

Page 8: ...eases by 1 level Minimum suction level Approximately 60 Hi 1 1 100 Hi switch Every time this switch is pressed the performance increases by 1 level Maximum suction level 100 ON switch and OFF switch t...

Page 9: ...grounding plug are connected correctly insulation is provided properly and the rated voltage is realized Confirm items 1 to 3 above and then proceed to the item 4 AT Turn ON the MAIN POWER switch and...

Page 10: ...ration procedure Connect the power plug to the electrical outlet suction hose hood to a proper position Turn ON the MAIN POWER switch and confirm that the power indicator Press the ON switch to start...

Page 11: ...n the ON and the panel is impossible to Temperature correction is not provided 3 5 6 F Attach a noise limiter Approximately 33 F to the output terminals Nos 1 2 and 3 When adding 33 0 1 1 2 3 5 6 8 7...

Page 12: ...The AT panel is disabled while the wires 4 and 8 are short circuited Yellow white Black White Operation pressure signal Output signals Transfers the current operation output Analog signal 0 5V Impedan...

Page 13: ...in body Transfer required output signals in accordance with the explanation in 5 3 Color and signal of each wire AT ON Lo Hi Change with Lo Hi switch pushing the ON switch of main body AT panel when y...

Page 14: ...the primary filter ter bag replace the secondary filter Make sure to turn OFF the main power and disconnect the power plug from the electrical outlet to cut off the electricity before starting Using a...

Page 15: ...he filter case The filter paper packing of the primary filter is inserted into the cylindrical pipe of the filter case Lightly push down the filter paper packing to remove it snap locks on the left an...

Page 16: ...tion Frequency Description Before operation Is the case closed completely Once day Is the exhaust port unclogged Once day Are no abnormal vibrations generated Is the installation level correct Once mo...

Page 17: ...hat the motor is not overheated by clogged filters 3 30 After checking 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error sta...

Page 18: ...450 100V Single phase 8 2 50 60 7 2 85 73 40 1 dB Note The Noise column indicates a value dB on the scale A at 1 m on the main body side when the hose is connected to the suction port 10 Consumable P...

Page 19: ...ect to change without prior notice Memo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 1 1 33 1 1 33 Hakush...

Reviews: