background image

Chiltern Invadex LiteTrack Portable Gantry

14

T

H

G

I

R

T

F

E

L

e

l

o

H

n

o

i

t

i

s

o

p

12

3

1

0

9

8

1

d

e

b

e

l

g

n

i

s

l

a

c

i

p

y

T

(

)

r

i

a

h

c

r

e

w

o

h

s

o

t

0

2

0

2

d

e

b

e

l

g

n

i

s

l

a

c

i

p

y

T

(

r

e

n

i

l

c

e

r

/

r

e

s

i

r

o

t

)

r

i

a

h

c

0

5

1

2

c

i

t

s

e

m

o

d

l

a

c

i

p

y

T

(

o

t

d

e

b

e

l

b

u

o

d

)

r

i

a

h

c

r

e

w

o

h

s

20

2

0

2

d

e

b

e

l

g

n

i

s

l

a

c

i

p

y

T

(

r

e

n

i

l

c

e

r

/

r

e

s

i

r

o

t

)

r

i

a

h

c

0

5

1

2

c

i

t

s

e

m

o

d

l

a

c

i

p

y

T

(

o

t

d

e

b

e

l

b

u

o

d

)

r

i

a

h

c

r

e

w

o

h

s

0

8

2

2

g

n

i

s

r

u

n

l

a

c

i

p

y

T

(

o

t

d

e

b

e

l

b

u

o

d

)

r

i

a

h

c

r

e

w

o

h

s

30

5

1

2

c

i

t

s

e

m

o

d

l

a

c

i

p

y

T

(

o

t

d

e

b

e

l

b

u

o

d

)

r

i

a

h

c

r

e

w

o

h

s

0

8

2

2

g

n

i

s

r

u

n

l

a

c

i

p

y

T

(

o

t

d

e

b

e

l

b

u

o

d

)

r

i

a

h

c

r

e

w

o

h

s

0

1

4

2

e

l

b

u

o

d

l

a

c

i

p

y

T

(

o

t

d

e

b

r

i

a

h

c

r

e

n

i

l

c

e

r

/

r

e

s

i

r

Width calculation guide

The table below can be used as a quick reference guide to help
determine the internal width of the gantry (depending on the hole position
which has been selected). For example - when the first hole position is
selected on the end beam and the same on the right end beam the internal
width is 1890mm, which will typically allow the transfer of a client from a
single bed to a shower chair).

Dimensions are in mm and for guidance only

User Guide

7

8.

General safety

note:

 When placing

the top beam on the
legs always position
hand behind the
corner quadrant as
Fig 8.1.

Corner quadrant

Note hand grasp point for safety
when assembling beam 

Fig 8.2

A

B

Do not

 lift the whole

cassette section. With
one end of the
cassette resting on
the floor hold the
assembled leg with
one hand, raise the
beam section and
place on top of the leg
as Fig 8.2 (A).

Fig 8.1

7. Fold over the
corner quadrant on
both end beams in
preparation for
connecting to the leg
as Fig 7 (A).

Ensure the cassette is

centralised

 in the

correct position
(latched). To achieve
this slide along until it
clicks into position in
the centre of the rail
as Fig 7 (B).

Fig 7

A

A

B

Summary of Contents for OHWLTRK-1

Page 1: ...ax 028 9127 0046 Chiltern Invadex Ltd Unit 16 Evans Business Centre 68 74 Queen ElizabethAvenue Hillington Industrial Estate Glasgow G52 4NQ Tel 0141 880 9986 Fax 0141 880 9990 Copyright Chiltern Inva...

Page 2: ...this is contained on page 2 Intended use of the Product 2 Things to consider before using the Gantry 2 Assembly Guide 4 Disassembly guide 11 Servicing maintenance 15 Parts 15 Troubleshooting 16 Gantry...

Page 3: ...he gantry is assembled and adjusted for level using the spirit levels on the end beams There are only 3 width adjustment holes per end beam The pin must always be located in one of these Safety Safety...

Page 4: ...tle the gantry The hoist should be lowered onto a bed chair or a Chiltern Invadex transportation trolley before it is disconnected from the gantry track Always follow the assembly dissassembly instruc...

Page 5: ...gantry is fully assembled A A A B C D LiteTrack Gantry Assembly Instructions Fig 2 Foot section x 2 Leg section x 2 Cassette x 1 End beam x 2 Foot section x 2 Leg section x 2 Cassette x 1 Gas strut x...

Page 6: ...stuck on the leg end beam section Spring mechanism has failed on the leg end beam section and will not push in manually Height of feet cannot be adjusted Cannot check gantry is level Lifting eye on ca...

Page 7: ...ncy of servicing should be increased in areas where the environment or heavy usage may cause deterioration of the equipment Further details can be obtained from any Chiltern Invadex Office shown on th...

Page 8: ...reference guide to help determine the internal width of the gantry depending on the hole position which has been selected For example when the first hole position is selected on the end beam and the...

Page 9: ...d cross beam and hold with one hand against the leg as Fig 11 A Secure in position using the handwheel as Fig 9 B Fig 11 A B A Pin should sit on top of the moulding User Guide 13 B A C B C A Fig 19 19...

Page 10: ...ior to adjusting the height and checking level Take care when moving the gantry to the desired location Move one leg at a time in small increments The gantry should be level in all directions Check th...

Page 11: ...n the gantry Release sufficient tape to connect the carabena on the hoist to the eye on the gantry as Fig 14 Do not lift the hoist to attach it to the gantry Fig 14 Fig 15 Final positioning User Guide...

Page 12: ...n the gantry Release sufficient tape to connect the carabena on the hoist to the eye on the gantry as Fig 14 Do not lift the hoist to attach it to the gantry Fig 14 Fig 15 Final positioning User Guide...

Page 13: ...ior to adjusting the height and checking level Take care when moving the gantry to the desired location Move one leg at a time in small increments The gantry should be level in all directions Check th...

Page 14: ...d cross beam and hold with one hand against the leg as Fig 11 A Secure in position using the handwheel as Fig 9 B Fig 11 A B A Pin should sit on top of the moulding User Guide 13 B A C B C A Fig 19 19...

Page 15: ...reference guide to help determine the internal width of the gantry depending on the hole position which has been selected For example when the first hole position is selected on the end beam and the...

Page 16: ...ncy of servicing should be increased in areas where the environment or heavy usage may cause deterioration of the equipment Further details can be obtained from any Chiltern Invadex Office shown on th...

Page 17: ...stuck on the leg end beam section Spring mechanism has failed on the leg end beam section and will not push in manually Height of feet cannot be adjusted Cannot check gantry is level Lifting eye on ca...

Page 18: ...gantry is fully assembled A A A B C D LiteTrack Gantry Assembly Instructions Fig 2 Foot section x 2 Leg section x 2 Cassette x 1 End beam x 2 Foot section x 2 Leg section x 2 Cassette x 1 Gas strut x...

Page 19: ...tle the gantry The hoist should be lowered onto a bed chair or a Chiltern Invadex transportation trolley before it is disconnected from the gantry track Always follow the assembly dissassembly instruc...

Page 20: ...he gantry is assembled and adjusted for level using the spirit levels on the end beams There are only 3 width adjustment holes per end beam The pin must always be located in one of these Safety Safety...

Page 21: ...this is contained on page 2 Intended use of the Product 2 Things to consider before using the Gantry 2 Assembly Guide 4 Disassembly guide 11 Servicing maintenance 15 Parts 15 Troubleshooting 16 Gantry...

Page 22: ...Dealers Name Address Post Code Telephone Your Serial Number is Date of purchase Please fill in the information below for future reference Models covered OHWLTRK 1 OHWLTRK 2...

Page 23: ...ax 028 9127 0046 Chiltern Invadex Ltd Unit 16 Evans Business Centre 68 74 Queen ElizabethAvenue Hillington Industrial Estate Glasgow G52 4NQ Tel 0141 880 9986 Fax 0141 880 9990 Copyright Chiltern Inva...

Reviews: