User Guide
7
Servicing and Maintenance
Based upon EN10535 and health and safety executive guidance Chiltern
Invadex recommend that hoists are fully serviced, including a load test, at
least every 12 months with an interim six monthly inspection to LOLER
requirements. Prices are available from Chiltern Invadex Service Offices. The
frequency of servicing should be increased in areas where the environment
or heavy usage may cause deterioration of the equipment. Further details
can be obtained from any Chiltern Invadex Office, shown on the back of this
booklet.
Chiltern Invadex and its Authorised Dealers are able to carry out all
aspects of servicing and maintenance work.
Maintenance of this equipment should only be conducted by engineers
trained and certified by Chiltern Invadex.
Keep the service record (at the back of this booklet) up to date.
DO NOT USE IF:
1. There is any damage to the hoist.
2. There is fraying or stitch damage to the lifting tape,
or slings.
To ensure maximum cleanliness
Wipe with a dry cloth (track and hoist). For stubborn marks use a damp cloth
and a mild cleanser. Always read the manufacturers instructions prior to
applying the cleanser.
Slings should be washed in accordance with the instructions on the label,
sewn into the sling.
Parts
item
description
qty
1
3 Button Hand Control 300-00120
1
2
5 Button Hand Control 300-00121
1
3
7 Button Hand Control 300-00122
1
1
2
3