background image

                                                                                                                                     

STCS4012 Series Layer 3 Switch Installation Guide

 

- - 16 - -                                                                                                                                                                                     

    www.stephen-tele.com 

 

Copyright Notice: 

No part of this document may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated 
into any language, in any form or by any means, electronic, mechanical, magnetic, optical, chemical, manual or 
otherwise without the prior written permission of Stephen Technologies Co.,Limited. 
 

Disclaimer Notice: 

No license is granted, implied or otherwise, under any patent or patent rights of Stephen Technologies Co.,LTD. 
Stephen Technologies Co.,LTD, makes no warranties, implied or otherwise, in regard to this document and to the 
products described in this document. The information provided by this document is believed to be accurate and 
reliable to the publication date of this document. However, Stephen Technologies Co.,LTD assumes no 
responsibility for any errors in this document. Furthermore, Stephen Technologies Co.,LTD, assumes no 
responsibility for the use or misuse of the information in this document and for any patent infringements that may 
arise from the use of this document. The information and product specifications within this document are subject to 
change at any time, without notice and without obligation to notify any person of such change. 
 
 

STEPHEN TECHNOLOGIES CO.,LIMITED

   

Building NO.5, YinHu Industry Area, JinHu Road   
NO.38, LuoHu District, Shenzhen,China 518029 
 
Tel: +86 755 83016956   
Fax:+86 755 83016321   
Website: 

www.stephen-tele.com 

 

Email: 

support@stephen-tele.com

     

 

 

 

Summary of Contents for STCS4012 Series

Page 1: ...STCS4012 Series Layer 3 Switch Installation Guide www stephen tele com STCS4012 Series Routing Switches Installtion Guide Manual VER 1 0 0 STEPHEN TECHNOLOGIES CO LIMITED ALL RIGHTS RESERVED...

Page 2: ...e manual is intended for the following readers Network engineers Network administrators Customers who are familiar with network fundamentals Conventions The manual uses the following conventions I Gen...

Page 3: ...ets For example pop up the New User window Multi level menus are separated by forward slashes For example File Create Folder IV Keyboard operation Format Description Key Press the key with the key nam...

Page 4: ...tele com Eye catching symbols are also used in the manual to highlight the points worthy of special attention during the operation They are defined as follows Caution Means reader be extremely carefu...

Page 5: ...Port 5 2 2 Rear Panel 5 2 3 Switch Performance 5 Chapter 3 Installation Preparation 7 3 1 Precautions 7 3 2 Requirements on Environment 7 3 2 1 Temperature Humidity Requirements 8 3 2 2 Laser Safety 8...

Page 6: ...HIMA has the independent intelligent property STCS4012 Series Routing Switches can provide various routing protocols VLAN management traffic control and Qos guarantee etc and it also provides perfect...

Page 7: ...re located on the convergence layer and connected to several L2 Ethernet switches such as SPEED S2026 Switch on the downlink and the backbone GE switch via the GE extended port on the uplink In this w...

Page 8: ...quence 1 AUX port 1 system led indicator 1 Power led indicator 1 pair of AUX Link ACT led indicators in the front panel The table below describes the indicators on the front panel of STCS4012ST Ethern...

Page 9: ...ibes the indicators on the front panel of STCS4012TF Ethernet Switch Table 2 3 Front panel indicators Indicator Sign State Meaning Power indicator PWR On The switch is powered on Off The switch is pow...

Page 10: ...h a pair of Modems when connected remotely and the execution of terminal simulator on PC 2 1 5 AUX Port The AUX port is an assistant management port Via this port Users can perform configuration local...

Page 11: ...for flow shaping and rich scheduling methods Queue Dispatching Methods WRR SP WRR SP Port Convergence Supports FE GE port convergence maximum 32 groups with 8 ports at most in each group Routing Proto...

Page 12: ...can operate normally under correct voltage input Make sure that the operating voltage is consistent with that labeled on the switch Do not open the chassis while the switch is in operation to protect...

Page 13: ...eopardize the CMOS circuit of the switch The Higher the temperature is the greater the damage to the switch will be The reliability of the switch will be then seriously affected and its service span w...

Page 14: ...abinet slots and the mounting angle iron of the switch 4 1 2 Installing the switch on the Workbench If 19 inch standard cabinet is not available you may simply place the switch on a clean workbench Ho...

Page 15: ...ch at the configuration terminal take the following steps to connect the console cable Step 1 Plug the console cable s DB 9 female connector to the serial port of the PC or the terminal where the swit...

Page 16: ...r cabling In the case of outdoor cabling check if the socket strip with lightning protection and network port lightning arrester have been connected Chapter 5 Booting and Configuration 5 1 Setting up...

Page 17: ...to VT100 The specific means is as follow 1 Click Start Program Accessories Communications Hyper Terminal to enter the Hyper Terminal window in which click icon to establish a new connection and the sy...

Page 18: ...port to be used in HyperTerminal connection 3 Click OK after the serial port is selected and the system will pop up the setting interface of the connecting serial port parameters shown in the followin...

Page 19: ...4 2 Powering on and Booting After the switch is powered on first run the BOOTROM program and the terminal yields the following output Stable and Portable Route Operating System SPROS Boot Copyright c...

Page 20: ...Check CPU 198 001512 MHz OK Switch Firmware Init OK Layer 2 Application OK Layer 3 Application OK Entering SPROS Initializing environment Done Loading startup config Done Welcome to SPROS Press Retur...

Page 21: ...ribed in this document The information provided by this document is believed to be accurate and reliable to the publication date of this document However Stephen Technologies Co LTD assumes no respons...

Reviews: