[DB600] General Instruction Manual
- 33 -
2-4
Trial operation
2-4-1
Confirmations before operation
Confirm followings before starting the operation.
Wiring
1.
Confirm that the wiring is done correctly.
Confirm fully the wiring of high voltage part such as power, output and event.
Confirm that terminal screws are not loose.
Confirm not only the wiring of this instrument but also the wiring of whole final product.
It is important to confirm surroundings of actuator (Thyristor regulator, heater and motor etc.), check
fully.
Power supply
2.
Confirm that power supply is in the rating range.
Setting contents
3.
Confirm that setting contents are correct.
After power ON, if output is unnecessary, set output 0% etc. by manual output operation.
Caution
The power supply other than rating range is connected, the instrument
may be damaged, its performance may deteriorate remarkably or it may
malfunction.
If an excess current or excess voltage is applied to input output terminal
of the instrument, the instrument may be damaged, its performance may
deteriorate remarkably or it may malfunction.
!