15
Connecting to the grid (AC utility)
1. Measure grid (utility) voltage and frequency. It should be 230VAC, 50Hz,
and single phase.
2. Open the breaker or fuse between PV-Inverter and utility.
3. For CPS SC1.5KTL, SC2.8KTL, SC2KTL, SC4KTL and SC4KTL-O,
connect AC wires as follows:
Insert utility wires through cable gland. Connect wires according to
polarities indicated on terminal block. L
→
LINE (brown or black), N
→
Neutral (blue) and
→
system ground (yellow-green).
Fasten the gland plate with attached screws.
Twist the gland so that the cable is firmly fixed.
Refer to left figure.