Edition 3.0E, 2010/07
20
Front Panel
Operating PV-Inverter is quite easy. During normal operation, the inverter
runs automatically. However, to achieve maximum conversion efficiency of
inverter please read the following information:
1.
Automatic ON-OFF: PV-Inverter starts up automatically when
DC-power from the PV panel is sufficient. Once the PV-Inverter starts it
enters one of the following 3 states:
Standby
: The PV string can only provide just enough voltage to
minimum requirements of the controller.
Waiting
: When the PV string DC voltage is greater than 100V, the
inverter enters a “waiting” state and attempts to connect to the
grid.
Normal operation
: When PV string DC voltage is greater than
150V, the inverter operates in the normal
state. In this state, it feeds power to the grid.
The inverter automatically stops when the PV
power is not enough.
2.
Starting-up display sequence: Once the PV power
is sufficient, inverter displays information as
shown in the flow chart to the right
3.
Change display information: During normal
operation, inverter can show details about its
operation status. The display is setup to
automatically indicate the supplying power to the
grid. Press the “Function” button on the front
panel and release it immediately to see additional
Model = xxxxxx
Waiting
Checking= XX sec
Normal State
Pac=xxxx.xW
Information during
start-up
Summary of Contents for CPS SC1.5KTL
Page 2: ......
Page 42: ...Edition 3 0E 2010 07 40 VDE Certificate European models ...