ChipBLASTER Inc
42
19.0. SYSTEM CONTAMINATION PURGING PROCEDURE (Cont.):
NOTE: ATTACH DISCHARGE TUBE TO FLUID CONTAINER IN
ORDER TO ELIMINATE FLUID SPILLING
.
19.4. FLUSHING CYCLE
19.4.1. Manually energize CR1 three (3) times for three (3) seconds.
19.5. REPLACE ALL PLUMBING FITTINGS AND PANELS TO THEIR
ORIGINAL CONFIGURATION.
REPLACE ALL GUARDS BEFORE OPERATING ChipBLASTER
Any questions on the Contamination Purging Procedures, please contact the
ChipBLASTER Service Department at (814) 724-6278
.
Have the model and serial
number of your ChipBLASTER unit.
!
19.0