ChipBLASTER Inc
6
2.0.
Table of Contents:
General
(Standard
Unit)
Page
3
General
(CE
Certified
Unit)
Page
4
General
warnings
Section
1.0
Page
5
Table
of
contents
Section
2.0
Page
6
Specifications Section
3.0
Page
8
Safety
precautions
Section
4.0
Page
9
Explanation of markings Section
4.1
Page
9
Storage Section
5.0
Page
14
Moving
machine
Section
6.0
Page
14
Placing
a
ChipBLASTER Section
7.0
Page
15
Mechanical
installation
Section
8.0
Page
16
Electrical
installation
Section
9.0
Page
17
Power
Interface
Section
9.1
Page
17
Control
Interface
Section
9.2
Page
17
Start
up
Section
10.0
Page
18
Air
Purge
Procedure Section
11.0
Page
19
Operation
Section
12.0
Page
20
Electrical
operation Section
12.1
Page
20
Coolant
flow Section
12.2
Page
20
Coolant flow Diagram (Figure 1)
Section 12.2
Page 21
Alarms Section
13.0
Page
22
Preventive maintenance
Section
14.0
Page
22
Schedule
(Figure
2) Section
14.1
Page
23
High pressure pump – Check oil - Dipstick Section 14.2
Page 24
High pressure pump – Check oil – Sight gauge
Section 14.2
Page 25
High-pressure pump –
Oil change procedure
Section 14.3
Page 26
High pressure pump – Check belt
Section
14.4
Page
29
High-pressure pump – Check for leaks
Section 14.5
Page 29
High-pressure pump – Rebuild
Section
14.6
Page
29
Return (Transfer) Pump – Check for leaks Section 14.9
Page 29
Cartridge filter – Check pressure gauge
Section 14.12
Page 29
Filter change procedure – General Warnings Section 14.13
Page 30
Dual manual change filter (shutdown)
Section 14.14
Page 30
Dual manual change filter (operating)
Section 14.15
Page 31
Filter Replacement form
Section
14.16 Page
32
Filter assemblies – Check for leaks
Section 14.17
Page 33
Filter assemblies – Cleaning
Section
14.18 Page
33
Pump mounting bolts – Check
Section
14.27 Page
33
Return pump - Check flow rate
Section 14.29
Page 33