70
7.0 Maintenance and troubleshooting
7.1
Routine Maintenance
7.1.1 Daily or before each operation; such as before the boot check. (Please refer to
the preceding section)
7.1.2. Operation of the new machine for 500 hours:
1) Oil filter.
2) The air filter core is removed and cleaned, and the compressed air below 0.2MPa
is blown clean from the inside to the outside.
3) Replacement of lubricants.
7.1.3 Every 1000 hours of operation:
1) Check the intake filter core or replace it.
7.1.4 For every 2000 hours or 6 months of operation:
1) Checking the lines of each department.
2) Inspect the lubricating oil and determine whether it is effective or replaced.
3) Inspect the oil mirror and remove the cleaning.
7.1.5 For every 3000 hours or year of operation:
1) Clean inlet and emptying valves.
2) Check three-phase solenoid valve.
3) Inspection of pressure maintenance valves.
4) Remove the cooler and clean the inner pipe with the external dust.
5) Replace air filter, oil filter, oil separator or filter element.
Summary of Contents for Quan Wei
Page 1: ...TaiWan QuanWei Screw type air compressor Using and Maintenance Instructions ...
Page 12: ...8 ...
Page 81: ...77 ...
Page 82: ...78 8 2 2 QWL 15A 20A 8 2 3 QWL 30A 40A ...
Page 83: ...79 8 2 4 QWL 50A 60A ...
Page 84: ...80 8 2 5 QWL 75A 100A ...
Page 85: ...81 8 2 6 QWL 150A 175A ...
Page 86: ...82 9 0 Circuit diagram ...
Page 87: ...83 9 1 MAM 860 880 Circuit diagram 9 2 MAM 890 Circuit diagram ...
Page 88: ...84 9 3 MAM 6080 Circuit diagram ...
Page 89: ...85 Screw Air Compressor operation record tale ...