CHK Power Quality Pty Ltd, User Manual
–
Miro Power Quality Logger and Analyser, 15 August 2016
Website:
; Enquiries:
Page 14
Address:
Unit 1, 3 Tollis Place, Seven Hills, NSW 2147, Sydney, Australia;
ABN:
53 169 840 831;
Telephone:
+61 2 8283 6945;
Fax:
+61 2 8212 8105;
Website:
2
Equipment maintenance
The Miro PQ25/35/45 instrument should be regularly tested and maintained to make sure
the equipment and leads are in proper working condition and fit for purpose.
2.1 Periodic maintenance and testing
The Miro and accessories should be inspected, tested and tagged as per the normal
procedures of your employer or responsible body.
2.2 Equipment faults
If the equipment is found to be faulty in any way, including suspected blown fuses, it should
be returned to CHK Power Quality Pty Ltd for service.
2.3 Calibration
The Miro should be calibrated every twelve (12) months.
2.4 Cleaning
The Miro, voltage leads, and current probes should be cleaned with a soft, moist cloth using
only a mild detergent.
After cleaning, ensure that all equipment is thoroughly dry before use. Check that all
connectors and connector receptacles are completely dry.