6. Once connected to the mains, check to make sure that the LED on the front panel is green within
a few seconds. Immediately after connecting the UPS to the AC network the equipment runs a self-
test. If the test is successful and the electricity supply is within the specified limits, the equipment will
start up and will supply energy to the output connectors.
7. Start up the protected equipment.
The voice and data line is connected for protection as shown on the input and output on the equip-
ment panel.
When the equipment is started, the batteries in the UPS are automatically charged. The UPS may be
used immediately even through the batteries have not been fully recharged. In this case, however, the
maximum residual capacity will not be available (complete discharge time).
Before running any tests, the batteries must be recharged for at least 6 hours.
Do not connect any equipment which could overload the UPS or draw continuous current from
the UPS (e.g.: hair driers, vacuum cleaners, etc.).
The UPS may be used even without being connected to the mains. To do so, the batteries must
be sufficiently charged. See “Button Functions”.
14
945012.066
REV: 16/03/01
Operating Manual
Summary of Contents for Cool Power 1200
Page 1: ......
Page 2: ......
Page 6: ...6 945012 066 REV 16 03 01 Operating Manual ...
Page 28: ...28 REV 16 03 01 945012 066 ...
Page 31: ......
Page 32: ......