To correctly install the unit, please follow the procedure described below:
1.Connect the load (i.e. PC CPU, Monitor) to the UPS Battery Protected outlets. Appropriate loads are
those units that will require extend run time during blackouts.
2. Connect the selected load (i.e. printer, scanner) to the surge protected outlet. Appropriate loads are
those elements that demand surge protection, but that do not require extended runtime during
power outages.
3. If the UPS will provide communication to a computing system, connect the comms cable to the
UPS comm port and to the PC serial port
Operating manual
14
945014.066
REV: 17/04/01
UK
Summary of Contents for Desk POWER 300
Page 1: ......
Page 2: ......
Page 6: ...6 945014 066 REV 17 04 01 ...
Page 8: ...Operating manual 8 945014 066 REV 17 04 01 UK ...
Page 28: ......
Page 30: ...Bedienungsanleitung 30 945014 066 REV 17 04 01 D ...
Page 50: ......
Page 52: ...Manual de usuario 52 945014 066 REV 17 04 01 E ...
Page 72: ......
Page 74: ...Manuel utilisateur 74 945014 066 REV 17 04 01 F ...
Page 94: ......
Page 96: ...Manuale d Uso 96 945014 066 REV 17 04 01 I ...
Page 116: ......
Page 118: ...Manual de instruçöes 118 945014 066 REV 17 04 01 P ...
Page 138: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ...CHLORIDE POWER PROTECTION www chloridepower com ...